Robert Sorby – The Move to Atlas

The move to Atlas from Athol Road was an incredibly challenging operation, which began back in November 2021. Sheffield Saws vacated the site in August 2021 and the mammoth clean-up operation of the building began.

Following 17 weeks of factory refurbishment, plant and machinery moves and capital investment, we were finally able to start full production in May 2022. As well as the factory refurbishment, the dreary offices have now been transformed into a bright and modern offices suite, with a Conference room facility and a kitchenette with a relaxing seating area for staff to take a break away from their desks.

We now feel very much at home in our new facility and look forward to our future at Atlas.